Volunteer Projects — Pacific Crest Trail Association
Mount Hood National Forest (Hood River, Zig Zag and Clackamas River Ranger Districts)
10/1/2007 to 9/30/2008

Activity Summary

Meeting: 23
Scouting: 67
Signing: 37
Trail Maintenance (PCT): 1865


Total Volunteer Hours: 1992

Activity Detail (most recent on top)

Project Date: 9/29/2008
Agency: Zig Zag Ranger District
Leader: Ron Goodwin
Location: Timberline Lodge
Description: Removed PCT signs a junctions before the snows come and groomers come over the area. Numbered each post and sleeve for easy locating next summer.

Volunteers

Hours
Goodwin, Ron 6
Weston, Ruth 6

Project Total: 12

Project Date: 9/26/2008
Agency: Zig Zag Ranger District
Leader: Ron Goodwin
Location: Barlow Pass to Timberline Lodge
Description: Cleaned 90 drain dips and 21 water bars. Repaired 100' of tread.

Volunteers

Hours
Goodwin, Katie 8
Goodwin, Ron 8

Project Total: 16

Project Date: 9/20/2008
Agency: Hood River Ranger District
Leader: John Vhay
Location: Chinidere shortcut to PCT from Eagle Creek
Description: Scouiting trip to evaluate possible American Hiking Society Volunteer Vacation work party in 2009.

Volunteers

Hours
Karlgaard, Karl 7
Vhay, John 7

Project Total: 14

Project Date: 9/18/2008
Agency: Clackamas River Ranger District
Leader: Kim Owen
Location: Olallie Lake to Big Lake
Description: Repaired 36 drain dips and 6 water bars.

Volunteers

Hours
Owen, Kim 10
Owen, Pam 10

Project Total: 20

Project Date: 9/13/2008 to 9/14/2008
Agency: Zig Zag Ranger District
Leader: Kim Owen
Location: Ramona Falls and Sandy River
Description: Repaired/created drainage system to divert active spring water from trail in area of annual slide area. Carried materials for Sandy River Guard Station repair.

Volunteers

Hours
Bishop, Glenn 15
Curtain, Gavin 15
Curtain, Joe 15
Gorman, Brian 15
Owen, Kim 19
Pekeider, Jay 15
Philichi, Chris 15
Philichi, Dylan 15
Rhodehamel, Derek 15

Project Total: 139

Project Date: 9/7/2008
Agency: Hood River Ranger District
Leader: Roberta Cobb
Location: Lolo Pass northbound
Description: Filled and repaired sunken trail just before cliff; removed slough and leveled trail 100'; cleared uphill side brush 25 feet; repaired two sections of trail past cliff where the tread was beginning to fail.

Volunteers

Hours
Chelin, Chuck 6
Cobb, Roberta 7
Gifford, Bill 9
Sakshaug, Arvid 8

Project Total: 30

Project Date: 8/26/2008
Agency: Hood River Ranger District
Leader: John Vhay
Location: Wahtum Lake
Description: Cleared 8 trees, cleaned 12 drain dips and repaired 2 slides. Brushed 800'.

Volunteers

Hours
Arkes, Bob 10
Fong, April Ann 10
Karlgaard, Karl 10
Murray, Michael 11
Regehr, Don 10
Riley, Dave 10
Vhay, John 10

Project Total: 71

Project Date: 8/25/2008
Agency: Zig Zag Ranger District
Leader: Ruth Weston
Location: Timberline Lodge to Zig Zag Canyon
Description: Cleared 2 trees, cleaned 82 drain dips and 6 water bars. Erected sign 16A behind Timberline Lodge. Removed sign 16 by amphitheater.

Volunteers

Hours
Weston, Ruth 8

Project Total: 8

Project Date: 8/23/2008
Agency: Zig Zag Ranger District
Leader: Jack Konner
Location: Top Spur to Mount Hood Wilderness Boundary
Description: Cleared 40 trees, cleared 10 drain dips and 15 water bars, repared tread creep in areas along switchbacks. Used power brusher for 1/4 mile along Muddy Fork and detour. Repaired tread on the newly brushed section. Pink ribbon installed along detour and muddy area planked over. New signs installed at Top Spur, Ramona loop and both ends of the detour.

Volunteers

Hours
Carter, Patty 11
Chelin, Chuck 9
Cobb, Roberta 11
Hanes, Douglas 11
Konner, Jack 11
Martiny, Chuck 11
O'Neil, Geoff 11
Plant, Steve 11
Ranganathan, Nandini 11
Settlemeyer, Lois 11
Stevenson, John 11

Project Total: 119

Project Date: 8/18/2008 to 8/20/2008
Agency: Hood River Ranger District
Leader: Barb Adams
Location: Lolo Pass to Wahtum Lake
Description: Cleared over 60 trees (biggest 32"). Brushed where logs were and filled a few holes.

Volunteers

Hours
Adams, Barb 25
Adams, Dave 25
Kenny, Harold 26
Schembs, Jim 7

Project Total: 83

Project Date: 8/14/2008
Agency: Zig Zag Ranger District
Leader: Jack Konner
Location: Top Spur to Ramona Falls parking lot
Description: Removed 9 small trees. Scouting.

Volunteers

Hours
Corwin, Susan 6
Konner, Jack 8

Project Total: 14

Project Date: 8/9/2008 to 8/13/2008
Agency: Zig Zag Ranger District
Leader: Ruth Weston
Location: Timberline Lodge to North Paradise Park Trail Junction
Description: Extensive tread repair in and north of Zig Zag Canyon.

Volunteers

Hours
Bartley, Michael 53
Cobb, Roberta 18
Gerhardt, Kim 45
Lee, Patty 53
Nordyke, Jay 53
Nordyke, Thomas 53
Owen, Kim 53
Person, Bill 59
Weston, Ruth 53

Project Total: 440

Project Date: 8/8/2008 to 8/9/2008
Agency: Hood River Ranger District
Leader: John Vhay
Location: Wahtum Lake
Description: Logged out 45 trees using crosscut saws. Repaired 6 water bars at springs, brushed and improved trtead for 150'.

Volunteers

Hours
Koppy, Larry 23
Marriott, Tyler 14
Pederson, Reed 21
Regehr, Don 23
Vhay, John 23
West, Duane 21

Project Total: 125

Project Date: 8/4/2008
Agency: Zig Zag Ranger District
Leader: Ruth Weston
Location: Timberline Lodge to Paradise Park
Description: Worked upheill tread at Zig Zag Canyon bridge. Removed 2 large rocks near bridge. Removed 18 trees and repaired 2 drain dips and 50' of tread.

Volunteers

Hours
Carr, Pete 13
Corwin, Susan 12
Vhay, John 13
Weston, Ruth 13

Project Total: 51

Project Date: 7/29/2008
Agency: Zig Zag Ranger District
Leader: Ruth Weston
Location: Timberline Lodge to 1/4 mile beyond "BEE" trail
Description: Scouting. Cleared 6 tree <12".

Volunteers

Hours
Weston, Ruth 9

Project Total: 9

Project Date: 7/28/2008
Agency: Zig Zag Ranger District
Leader: Ron Goodwin
Location: Timberline Lodge
Description: Replaced 7 PCT signs, stashed 3 signs to be installed in sleeves in 2 weeks because of snow covering trails leading to PCT.

Volunteers

Hours
Goodwin, Katie 5
Goodwin, Ron 5
Weston, Ruth 5

Project Total: 15

Project Date: 7/27/2008
Agency: Hood River Ranger District
Leader: Jack Konner
Location: Top Spur to Lolo Pass (and Top Spur Trail)
Description: Cleared 28 trees, brushed 1 miles, filled holes and removed debris.

Volunteers

Hours
Beard, Dennis 9
Carter, Patty 9
Hanes, Douglas 9
Konner, Jack 9
Martiny, Chuck 9
O'Neil, Geoff 9
Plant, Steve 9
Ranganathan, Nandini 9
Squires, Bob 9
Vhay, John 9
Weston, Ruth 9

Project Total: 99

Project Date: 7/19/2008
Agency: Zig Zag Ranger District
Leader: Steve Plant
Location: Wapinitia Pass to Little Crater Lake
Description: cleared 34 trees and cleaned 6 drain dips and 11 water bars. Extensive brushing and minor tread repair.

Volunteers

Hours
Creelman, Kevin 11
Goodwin, Ron 11
Hanes, Douglas 11
Luyan, Melissa 11
Plant, Steve 11
Ranganathan, Nandini 11
Stevenson, John 11

Project Total: 77

Project Date: 7/18/2008 to 7/20/2008
Agency: Zig Zag Ranger District
Leader: Kim Owen
Location: Sandy River to Paradise Park
Description: Cleared 25 trees. Repaired 36 drain dips and 3 water bars. Brushed 200 yards and repaired 20 feet of tread.

Volunteers

Hours
Auerbach, Paul 21
Cunningham, John 22
Fong, April Ann 21
Kirchmiller, Christie 19
Kirchmiller, Robert 19
Owen, Kim 14
Roe, David 18
Young, Lee 22

Project Total: 156

Project Date: 7/18/2008
Agency: Hood River Ranger District
Leader: Barb Adams
Location: Lolo Pass
Description: Minor drainage repair. Cleaned one culvert. Cleaned one water bar.

Volunteers

Hours
Adams, Barb 4
Adams, Dave 4
Adams, Julie 4

Project Total: 12

Project Date: 7/17/2008
Agency: Zig Zag Ranger District
Leader: Ron Goodwin
Location: Barlow Pass to Timberline Lodge
Description: Scouting.

Volunteers

Hours
Goodwin, Katie 10
Goodwin, Ron 10

Project Total: 20

Project Date: 7/14/2008
Agency: Hood River Ranger District
Leader: Jack Konner
Location: Top Spur to Lolo Pass
Description: Scouting

Volunteers

Hours
Konner, Jack 7

Project Total: 7

Project Date: 7/13/2008
Agency: Zig Zag Ranger District
Leader: Ruth Weston
Location: Timberline Lodge
Description: Scouting. . . SNOW!

Volunteers

Hours
Van Gundy, Jackie 5
Weston, Ruth 5

Project Total: 10

Project Date: 7/10/2008 to 7/12/2008
Agency: Zig Zag Ranger District
Leader: Kim Owen
Location: Ramona Falls to Sandy River
Description: Cleared 8 trees (6" to 10"). Repaired 10 drain dips, 100 yard of slide damage, 100 yards of brushing and 300 yards of tread.

Volunteers

Hours
Cohoe, Kelly 26
Cohoe, Michael 23
Cohoe, Philip 23
Janzen, Andrew 23
Janzen, Paul 23
Jespersen, Kyle 23
Johnson, Gabriel 23
Owen, Kim 26
Sathrum, John 23
Smith, Greg 23
Smith, Tom 23

Project Total: 259

Project Date: 7/6/2008
Agency: Hood River Ranger District
Leader: Roberta Cobb
Location: Barlow Pass south
Description: Cleared 60 trees in 3 miles, 8" to 12". Light brushing.

Volunteers

Hours
Cobb, Roberta 9
Martiny, Chuck 10
Towill, Elizabeth 9

Project Total: 28

Project Date: 7/3/2008 to 7/4/2008
Agency: Zig Zag Ranger District
Leader: Kim Owen
Location: Sandy River to Paradise Park
Description: Cleared 6 logs.

Volunteers

Hours
Owen, Kim 17
Owen, Pam 17

Project Total: 34

Project Date: 7/2/2008
Agency: Hood River Ranger District
Leader: Roberta Cobb
Location: Hood River Ranger Station
Description: Meeting to discuss bike races between Twin Lakes and Palmateer.

Volunteers

Hours
Adams, Barb 7
Cobb, Roberta 8
Vhay, John 8

Project Total: 23

Project Date: 7/2/2008
Agency: Hood River Ranger District
Leader: Jack Konner
Location: Top Spur to Lolo Pass
Description: Scouting

Volunteers

Hours
Konner, Jack 7

Project Total: 7

Project Date: 6/30/2008
Agency: Hood River Ranger District
Leader: Roberta Cobb
Location: Frog Lake north
Description: Cloeared 18 trees in two miles (< 8"). Posted logs at the junction with Frog Lake trail, at the junction to the trailhead spur, and at the Hwy 26 crossing (just a sticker, did not have the ful size platic logo). Picked up lots of litter.

Volunteers

Hours
Cobb, Roberta 10
Weston, Ruth 9

Project Total: 19

Project Date: 6/15/2008
Agency: Zig Zag Ranger District
Leader: Richard Walker
Location: Little Crater Lake to Road 42
Description: Cleared 8 trees. Brushed rhododendron and vine maple for half mile.

Volunteers

Hours
Moore, Mickey 10
Walker, Ford 10
Walker, Penny 10
Walker, Richard 10

Project Total: 40

Project Date: 5/18/2008
Agency: Hood River Ranger District
Leader: Roberta Cobb
Location: Frog Lake
Description: Cleared 2 trees from Frog Lake to the first switchback at which point snow prevented further progress.

Volunteers

Hours
Cobb, Roberta 5

Project Total: 5

Project Date: 11/16/2007
Agency: Zig Zag Ranger District
Leader: Kim Owen
Location: Ramona Falls loop
Description: Removed 2 trees (14" and 18"). Repaired 6 water bars and 1 root wad damage. Cleaned under Ramona Creek log bridge.

Volunteers

Hours
Owen, Kim 10
Richard, Jeff 10

Project Total: 20

Project Date: 10/15/2007
Agency: Zig Zag Ranger District
Leader: Ron Goodwin
Location: Timberline Lodge area
Description: Removed and lay down locked signs before snow grooming machines operate.

Volunteers

Hours
Goodwin, Ron 5
Weston, Ruth 5

Project Total: 10