Mount Hood Chapter, Pacific Crest Trail Association
Activity Report
1/1/2007 to 12/31/2007 (Generated 2/17/2008)

Activity Summary

Administration: 682
Meeting: 389
Other: 46
Register Monitoring: 42
Scouting: 240
Signing: 24
Trail Maintenance (Feeder): 408
Trail Maintenance (Other): 476
Trail Maintenance (PCT): 3693
Trail Protection: 24
Training: 452


Total Volunteer Hours: 6476

Activity Detail (most recent on top)

Project Date: 12/29/2007
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (Other)
Leader: Kim Owen
Location: Oneonta Trail
Description: Logged out 2 24" trees, cleaned 2 drain dips, mitigated root wad damage.

Volunteers

Hours
Owen, Kim 6

Project Total: 6

Project Date: 12/29/2007
Agency: Columbia River Gorge
Activity Type: Scouting
Leader: Roberta Cobb
Location: Eagle Trail to Punchbowl
Description: Scouting. Slide damage extensive in first half mile.

Volunteers

Hours
Cobb, Roberta 5
Weston, Ruth 5

Project Total: 10

Project Date: 12/10/2007
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (Other)
Leader: Roberta Cobb
Location: Ponytail Falls Trail
Description: Popped rocks and filled holes with gravel. 1065' of tread repair.

Volunteers

Hours
Abell, Chris 8
Carr, Pete 8
Chelin, Chuck 8
Cobb, Dave 8
Cobb, Roberta 8
Portera, Brian 8
Settlemeyer, Lois 8
Warner, Sam 8
Weston, Ruth 8

Project Total: 72

Project Date: 11/26/2007
Agency: N/A
Activity Type: Training
Leader: Steve Queen
Location: Trout Lake Washington
Description: Advanced tool training seminar

Volunteers

Hours
Cobb, Roberta 44
Hawley, Bill 44
Owen, Kim 44
Weston, Ruth 44

Project Total: 176

Project Date: 11/16/2007
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Kim Owen
Location: Ramona Falls loop
Description: Removed 2 trees (14" and 18"). Repaired 6 water bars and 1 root wad damage. Cleaned under Ramona Creek log bridge.

Volunteers

Hours
Owen, Kim 10
Richard, Jeff 10

Project Total: 20

Project Date: 11/14/2007
Agency: Mount Adams Ranger District
Activity Type: Meeting
Leader: Tom Linde
Location: USFS offices
Description: Grant meeting

Volunteers

Hours
Linde, Tom 3

Project Total: 3

Project Date: 11/5/2007
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (Other)
Leader: Roberta Cobb
Location: Multnomah Falls / Larch Mountain Trail
Description: Hauled cement mix, tools and rails and posts uphill using Honda toters. Installed 130 feet of split rail fencing.

Volunteers

Hours
Carr, Pete 8
Chelin, Chuck 8
Cobb, Roberta 8
Davidson, Tom 8
Hammack, Brice 8
Hawley, Bill 8
Vetter, Dick 8
Walker, Richard 8
Warner, Sam 8
Weston, Ruth 8
Winkler, Dan 8

Project Total: 88

Project Date: 11/3/2007
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (Feeder)
Leader: Roberta Cobb
Location: Eagle Creek
Description: Trying to bring down the hanging cliff. Edan and Jeff for USFS present.

Volunteers

Hours
Cobb, Roberta 6

Project Total: 6

Project Date: 11/2/2007
Agency: N/A
Activity Type: Training
Leader: Steve Queen
Location: Crosscut saw training (Wind River Work Center)
Description: 2 volunteers participated in training to become a volunteer certifiers.

Volunteers

Hours
Hawley, Bill 30
Owen, Kim 30

Project Total: 60

Project Date: 10/27/2007
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (Feeder)
Leader: Roberta Cobb
Location: Eagle Creek
Description: Repaired 2 slides.

Volunteers

Hours
Berthold, Dana 4
Carr, Pete 5
Chelin, Chuck 6
Cobb, Roberta 4
Maddox, Ken 4
Squires, Bob 4
Vetter, Dick 4

Project Total: 31

Project Date: 10/24/2007
Agency: N/A
Activity Type: Meeting
Leader: Steve Queen
Location: Roberta Cobb's house
Description: October caretaker meeting

Volunteers

Hours
Allen, Eric 3
Arkes, Bob 3
Berthold, Dana 4
Cobb, Roberta 2
Goodwin, Ron 3
Hammack, Brice 3
Hawley, Bill 3
Konner, Jack 3
Lukins, Dick 3
McLaughlin, Larry 3
Owen, Kim 3
Owen, Pam 3
Queen, Steve 9
Strahm, Ernie 3
Walker, Richard 3
Weston, Ruth 3
Wolf, Becky 3

Project Total: 57

Project Date: 10/17/2007
Agency: Mount Adams Ranger District
Activity Type: Trail Protection
Leader: Brice Hammack
Location: Sasquatch timber sale
Description: DNR timber sale examination

Volunteers

Hours
Allen, Eric 8
Hammack, Brice 8
McLaughlin, Larry 8

Project Total: 24

Project Date: 10/15/2007
Agency: Zig Zag Ranger District
Activity Type: Signing
Leader: Ron Goodwin
Location: Timberline Lodge area
Description: Removed and lay down locked signs before snow grooming machines operate.

Volunteers

Hours
Goodwin, Ron 5
Weston, Ruth 5

Project Total: 10

Project Date: 10/8/2007
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Bill Hawley
Location: Indian Heaven to Sawtooth Berry Fields
Description: Removed 1 24" tree. Cleaned over 20 drain dips. Installed 14 water bars and check dams. Power brush cutter outside Wilderness. 200 yards of berm removal.

Volunteers

Hours
Carr, Pete 21
Hawley, Bill 23

Project Total: 44

Project Date: 10/1/2007
Agency: N/A
Activity Type: Administration
Leader: Steve Queen
Location: Administration
Description: Administrative hours.

Volunteers

Hours
Cobb, Roberta 3
Hawley, Bill 35
Owen, Kim 81

Project Total: 119

Project Date: 9/29/2007
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Bill Hawley
Location: Indian Heaven Wilderness
Description: AmeriCorps crew.

Volunteers

Hours
Hawley, Bill 38

Project Total: 38

Project Date: 9/24/2007
Agency: Mount Adams Ranger District
Activity Type: Scouting
Leader: Bob Arkes
Location: Williams Mine Road to Riley Creek
Description: Scouting.

Volunteers

Hours
Arkes, Bob 12
Hawley, Bill 12

Project Total: 24

Project Date: 9/22/2007
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Ruth Weston
Location: Timberline Lodge to Zig Zag Canyon
Description: Cleaned 24 drain dips and 6 water bars. Repaired 800' of tread.

Volunteers

Hours
Arkes, Bob 10
Arkes, Jane 10
Cobb, Roberta 10
Fong, April Ann 10
Hanes, Douglas 10
Lameka, Ann 10
Ranganathan, Nandini 10
Vhay, John 10
Weston, Ruth 10

Project Total: 90

Project Date: 9/14/2007
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Bill Hawley
Location: Road 60 to Junction Lake
Description: Cleaned 35 drain dips, Installed 4 and cleaned 3 water bars. Brushed half mile of huckleberry. Removed berm for 250 yards.

Volunteers

Hours
Carr, Pete 23
Cunningham, John 23
Gifford, Bill 23
Hawley, Bill 35
Hawley, Karla 34
Pikkola, Dane 23

Project Total: 161

Project Date: 9/12/2007
Agency: N/A
Activity Type: Meeting
Leader: Steve Queen
Location: Steve Queen's house
Description: September caretakers meeting

Volunteers

Hours
Adams, Barb 3
Cobb, Roberta 3
Goodwin, Ron 3
Hawley, Bill 3
Konner, Jack 3
Lukins, Dick 3
Owen, Kim 3
Owen, Pam 3
Plant, Steve 3
Queen, Steve 2
Weston, Ruth 3

Project Total: 32

Project Date: 9/11/2007
Agency: Mount Adams Ranger District
Activity Type: Scouting
Leader: Tom Linde
Location: Potato Hill to Crest Camp
Description: Scouting

Volunteers

Hours
Linde, Tom 33

Project Total: 33

Project Date: 9/8/2007
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (Other)
Leader: Jack Konner
Location: Pioneer Bridle Trail
Description: Transported dirt and rocks to raise level of tread.

Volunteers

Hours
Bartos, Heather 7
Bartos, Jim 7
Carter, Patty 7
Cobb, Roberta 7
Goodwin, Ron 7
Hammack, Brice 7
Hanes, Douglas 7
Karlgaard, Karl 7
Konner, Jack 7
O'Neil, Geoff 7
Queen, Steve 7
Ranganathan, Nandini 7
Weston, Ruth 7

Project Total: 91

Project Date: 9/4/2007
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Bill Hawley
Location: Road 60 (north and south)
Description: Removed misc. late season blowdown.

Volunteers

Hours
Hawley, Bill 7
Hawley, Karla 7

Project Total: 14

Project Date: 9/2/2007
Agency: Mount Adams Ranger District
Activity Type: Scouting
Leader: Bill Hawley
Location: Road 60 to Indian Heaven Wilderness boundary
Description: Scouted trenching problems.

Volunteers

Hours
Hawley, Bill 6

Project Total: 6

Project Date: 9/1/2007
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Kim Owen
Location: Timberline Lodge to Ramona Falls
Description: Cleaned 73 drain dips and 12 water bars.

Volunteers

Hours
Owen, Emily 20
Owen, Kim 20
Owen, Pam 20

Project Total: 60

Project Date: 8/29/2007
Agency: Hood River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: John Vhay
Location: Camp Smokey
Description: Trail maintenance.

Volunteers

Hours
Carr, Pete 12
Doty, Pat 12
Murray, Michael 12
Vhay, John 12

Project Total: 48

Project Date: 8/26/2007
Agency: Columbia River Gorge
Activity Type: Signing
Leader: Kim Owen
Location: South boundary Hatfield Wilderness
Description: Replaced Wilderness sign.

Volunteers

Hours
Owen, Kim 7
Owen, Pam 7

Project Total: 14

Project Date: 8/24/2007
Agency: N/A
Activity Type: Other
Leader: Bill Hawley
Location: Bridge of the Gods
Description: Building tool shed at toll booth for Dana Berthold.

Volunteers

Hours
Hawley, Bill 9

Project Total: 9

Project Date: 8/20/2007
Agency: Hood River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Roberta Cobb
Location: Frog Lake north
Description: Removed 1 tree (20") with many limbs.

Volunteers

Hours
Cobb, Roberta 4
Grimsby, Benjamin 4
Grimsby, Kelsey 4
Grimsby, Lucas 4
Grimsby, Russell 4

Project Total: 20

Project Date: 8/18/2007
Agency: Mount Adams Ranger District
Activity Type: Scouting
Leader: Tom Linde
Location: Sedum Ridge to Rock Creek
Description: Scouting

Volunteers

Hours
Linde, Tom 8

Project Total: 8

Project Date: 8/13/2007
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Tom Linde
Location: Panther Creek to Crest Camp
Description: Light brushing for 2.5 miles.

Volunteers

Hours
Linde, Tom 11

Project Total: 11

Project Date: 8/12/2007
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (PCT)
Leader: Eric Allen
Location: Table Mountain to Carpenter's Lake trail junction
Description: Llogged out 6 trees. Cleaned 25 rain dips and 5 water bars. Repired 2 washouts. Spot brusing.

Volunteers

Hours
Allen, Eric 14
Hammack, Brice 13
Hilands, Bill 13
Knight, Sue 13
Lamb, Glenn 13

Project Total: 66

Project Date: 8/11/2007
Agency: Columbia River Gorge
Activity Type: Trail Maintenance (PCT)
Leader: Steve Queen
Location: Gillette Lake south
Description: Cascade Locks PCT Day. Brushed half mile with power brush cutters and hand loppers.

Volunteers

Hours
Berthold, Dana 4
Cobb, Roberta 6
Hammack, Brice 6
Martiny, Chuck 6
Queen, Steve 6

Project Total: 28

Project Date: 8/8/2007
Agency: N/A
Activity Type: Meeting
Leader: Steve Queen
Location: Jack Konner's house
Description: August caretaker meeting

Volunteers

Hours
Allen, Eric 3
Berthold, Dana 4
Cobb, Roberta 3
Hammack, Brice 3
Hawley, Bill 3
Konner, Jack 2
Lukins, Dick 3
Owen, Kim 3
Plant, Steve 3
Queen, Steve 3
Vhay, John 3
Webb, Jim 3
Wolf, Becky 3

Project Total: 39

Project Date: 8/1/2007
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Tom Linde
Location: Mount Adams Ranger District
Description: 2 miles of brushing and 1/4 mile of tread repair

Volunteers

Hours
Griffin, Scott 8
Linde, Tom 7
McCollum, Bob 8

Project Total: 23

Project Date: 7/29/2007
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Kim Owen
Location: Sandy River
Description: Posted signs on ne PCT reroute. Guided in volunteers to worksite. Carried in 40 pounds of food to resupply AmeriCorps crew.

Volunteers

Hours
Owen, Kim 10
Owen, Pam 10

Project Total: 20

Project Date: 7/29/2007
Agency: Hood River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Barb Adams
Location: Lolo Pass north
Description: Removed 9 trees. Filled 4 holds. Fixed 1 culvert.

Volunteers

Hours
Adams, Barb 8
Adams, Dave 8
Eggleston, Mike 8
Kenny, Harold 9

Project Total: 33

Project Date: 7/27/2007
Agency: Clackamas River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Ernie Strahm
Location: Jude Lake to Mount Jefferson Wilderness
Description: Removed 17 trees, repaired 12 water bars and 80 drain dips, brushed 2 miles and repaired 4 miles of tread. Repaired 1 slide. Created 5 new log water bars.

Volunteers

Hours
Adams, Myra 17
Brush, Ann 12
Brush, Dan 12
Cuerden, Becky 17
Davidson, Leslie 16
Fisher, Jim 24
Hutchison, Cindy 17
Hutchison, Dewayne 17
Hutchison, Robin 17
Hutchison, Seth 17
Jones, Larry 17
Rivera, Carla 8
Rivera, Richard 8
Robertson, Clyde 17
Roper, David 17
Sheldon, Hal 16
Stoutt, Jeff 17
Strahm, Ernie 25
Welliver, Don 25

Project Total: 316

Project Date: 7/26/2007
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Kim Owen
Location: Sandy River
Description: Removed 16 trees (5: 12"; 5: 6"). Surveyed root wad project and Sandy River rebuild. Provided food drop to AmeriCorps crew.

Volunteers

Hours
Owen, Kim 15
Owen, Pam 15

Project Total: 30

Project Date: 7/24/2007
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Jack Konner
Location: Sandy River and Muddy Fork
Description: Worked with AmeriCorps crew doing 2 reroutes in Sandy River area.

Volunteers

Hours
Konner, Jack 24

Project Total: 24

Project Date: 7/21/2007
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Jack Konner
Location: Top Spur to Muddy Fork
Description: Removed 30 trees (6" to 28"). Cleaned 12 drain dips and 15 water bars. Filled holes in tread.

Volunteers

Hours
Barberis, Joe 13
Bartos, Heather 13
Bartos, Jim 13
Carter, Patty 13
Goodwin, Ron 13
Konner, Jack 13
Lum, Richard 13
O'Neil, Geoff 13

Project Total: 104

Project Date: 7/20/2007
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Bob Arkes
Location: Road 23 to Horseshoe Meadow
Description: Removed 15 trees (8" to 10"; 20"). Cleaned 200 drain dips. Brushed from Road 23 to Williams Mine Road. Repaired about 1,000' of tread.

Volunteers

Hours
Arkes, Bob 17
Arkes, Jane 17
Cunningham, John 17
Hawley, Bill 17
Nyberg, Carl 21
Vhay, John 17
Warner, Sam 17
Webb, Jim 15

Project Total: 138

Project Date: 7/18/2007
Agency: Zig Zag Ranger District
Activity Type: Scouting
Leader: Kim Owen
Location: Ramona Falls area
Description: Project survey for PCT re-route near Sandy River with Sara Hanson, PCTA Trail Technical Advisior.

Volunteers

Hours
Owen, Kim 12

Project Total: 12

Project Date: 7/16/2007
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Ruth Weston
Location: Timberline Lodge to Paradise Park trail junction
Description: Cleaned 15 drain dips. Repaired a 12' slide in Roaring River Canyon. Brushed 800' in Zig Zag Canyon.

Volunteers

Hours
Meador, Corey 11
Weston, Ruth 11

Project Total: 22

Project Date: 7/15/2007
Agency: Hood River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Barb Adams
Location: Indian Spring
Description: Removed 26 trees (medium to 22").

Volunteers

Hours
Adams, Barb 22
Adams, Dave 22
Eggleston, Connie 10
Eggleston, Mike 10
Kenny, Harold 22

Project Total: 86

Project Date: 7/14/2007
Agency: Clackamas River Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Becky Wolf
Location: Road 4245
Description: Logged out 4 trees (35", 26", 20", 16").

Volunteers

Hours
Reimers, Wes 8
Roe, David 8
Wolf, Becky 8

Project Total: 24

Project Date: 7/11/2007
Agency: N/A
Activity Type: Meeting
Leader: Steve Queen
Location: Kim and Pam Owen's house
Description: July caretaker meeting.

Volunteers

Hours
Allen, Eric 3
Arkes, Bob 3
Cobb, Roberta 3
Goodwin, Ron 3
Hammack, Brice 3
Konner, Jack 3
Lukins, Dick 3
McLaughlin, Larry 3
Owen, Kim 2
Owen, Pam 2
Plant, Steve 3
Vhay, John 3
Walker, Richard 3
Weston, Ruth 3

Project Total: 40

Project Date: 7/10/2007
Agency: Mount Adams Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Tom Linde
Location: Panther Crek to Crest Camp
Description: Light brusing for 2 miles

Volunteers

Hours
Linde, Tom 8

Project Total: 8

Project Date: 7/7/2007
Agency: Zig Zag Ranger District
Activity Type: Trail Maintenance (PCT)
Leader: Kim Owen
Location: Ramona Falls to Paradise Park Trail Junction
Description: Cleared 60 trees. Brushed 100 yards, pole sawing, repaired washout.

Volunteers

Hours
Cobb, Roberta