Volunteer Projects — Pacific Crest Trail Association
All Agencies
10/1/2006 to 9/30/2007

Activity Summary

Administration: 563
Meeting: 329
Other: 46
Register Monitoring: 42
Scouting: 230
Signing: 14
Trail Maintenance (Feeder): 371
Trail Maintenance (Other): 310
Trail Maintenance (PCT): 4546
Training: 216


Total Volunteer Hours: 6667

Activity Detail (most recent on top)

Project Date: 9/29/2007
District: Mount Adams Ranger District
Leader: Bill Hawley
Location: Indian Heaven Wilderness
Description: AmeriCorps crew.

Volunteers

Hours
Hawley, Bill 38

Project Total: 38

Project Date: 9/24/2007
District: Mount Adams Ranger District
Leader: Bob Arkes
Location: Williams Mine Road to Riley Creek
Description: Scouting.

Volunteers

Hours
Arkes, Bob 12
Hawley, Bill 12

Project Total: 24

Project Date: 9/22/2007
District: Zig Zag Ranger District
Leader: Ruth Weston
Location: Timberline Lodge to Zig Zag Canyon
Description: Cleaned 24 drain dips and 6 water bars. Repaired 800' of tread.

Volunteers

Hours
Arkes, Bob 10
Arkes, Jane 10
Cobb, Roberta 10
Fong, April Ann 10
Hanes, Douglas 10
Lameka, Ann 10
Ranganathan, Nandini 10
Vhay, John 10
Weston, Ruth 10

Project Total: 90

Project Date: 9/14/2007
District: Mount Adams Ranger District
Leader: Bill Hawley
Location: Road 60 to Junction Lake
Description: Cleaned 35 drain dips, Installed 4 and cleaned 3 water bars. Brushed half mile of huckleberry. Removed berm for 250 yards.

Volunteers

Hours
Carr, Pete 23
Cunningham, John 23
Gifford, Bill 23
Hawley, Bill 35
Hawley, Karla 34
Pikkola, Dane 23

Project Total: 161

Project Date: 9/12/2007
District: N/A
Leader: Steve Queen
Location: Steve Queen's house
Description: September caretakers meeting

Volunteers

Hours
Adams, Barb 3
Cobb, Roberta 3
Goodwin, Ron 3
Hawley, Bill 3
Konner, Jack 3
Lukins, Dick 3
Owen, Kim 3
Owen, Pam 3
Plant, Steve 3
Queen, Steve 2
Weston, Ruth 3

Project Total: 32

Project Date: 9/11/2007
District: Mount Adams Ranger District
Leader: Tom Linde
Location: Potato Hill to Crest Camp
Description: Scouting

Volunteers

Hours
Linde, Tom 33

Project Total: 33

Project Date: 9/8/2007
District: Zig Zag Ranger District
Leader: Jack Konner
Location: Pioneer Bridle Trail
Description: Transported dirt and rocks to raise level of tread.

Volunteers

Hours
Bartos, Heather 7
Bartos, Jim 7
Carter, Patty 7
Cobb, Roberta 7
Goodwin, Ron 7
Hammack, Brice 7
Hanes, Douglas 7
Karlgaard, Karl 7
Konner, Jack 7
O'Neil, Geoff 7
Queen, Steve 7
Ranganathan, Nandini 7
Weston, Ruth 7

Project Total: 91

Project Date: 9/4/2007
District: Mount Adams Ranger District
Leader: Bill Hawley
Location: Road 60 (north and south)
Description: Removed misc. late season blowdown.

Volunteers

Hours
Hawley, Bill 7
Hawley, Karla 7

Project Total: 14

Project Date: 9/2/2007
District: Mount Adams Ranger District
Leader: Bill Hawley
Location: Road 60 to Indian Heaven Wilderness boundary
Description: Scouted trenching problems.

Volunteers

Hours
Hawley, Bill 6

Project Total: 6

Project Date: 9/1/2007
District: Zig Zag Ranger District
Leader: Kim Owen
Location: Timberline Lodge to Ramona Falls
Description: Cleaned 73 drain dips and 12 water bars.

Volunteers

Hours
Owen, Emily 20
Owen, Kim 20
Owen, Pam 20

Project Total: 60

Project Date: 8/29/2007
District: Hood River Ranger District
Leader: John Vhay
Location: Camp Smokey
Description: Trail maintenance.

Volunteers

Hours
Carr, Pete 12
Doty, Pat 12
Murray, Michael 12
Vhay, John 12

Project Total: 48

Project Date: 8/26/2007
District: Columbia River Gorge
Leader: Kim Owen
Location: South boundary Hatfield Wilderness
Description: Replaced Wilderness sign.

Volunteers

Hours
Owen, Kim 7
Owen, Pam 7

Project Total: 14

Project Date: 8/24/2007
District: N/A
Leader: Bill Hawley
Location: Bridge of the Gods
Description: Building tool shed at toll booth for Dana Berthold.

Volunteers

Hours
Hawley, Bill 9

Project Total: 9

Project Date: 8/20/2007
District: Hood River Ranger District
Leader: Roberta Cobb
Location: Frog Lake north
Description: Removed 1 tree (20") with many limbs.

Volunteers

Hours
Cobb, Roberta 4
Grimsby, Benjamin 4
Grimsby, Kelsey 4
Grimsby, Lucas 4
Grimsby, Russell 4

Project Total: 20

Project Date: 8/18/2007
District: Mount Adams Ranger District
Leader: Tom Linde
Location: Sedum Ridge to Rock Creek
Description: Scouting

Volunteers

Hours
Linde, Tom 8

Project Total: 8

Project Date: 8/13/2007
District: Mount Adams Ranger District
Leader: Tom Linde
Location: Panther Creek to Crest Camp
Description: Light brushing for 2.5 miles.

Volunteers

Hours
Linde, Tom 11

Project Total: 11

Project Date: 8/12/2007
District: Columbia River Gorge
Leader: Eric Allen
Location: Table Mountain to Carpenter's Lake trail junction
Description: Llogged out 6 trees. Cleaned 25 rain dips and 5 water bars. Repired 2 washouts. Spot brusing.

Volunteers

Hours
Allen, Eric 14
Hammack, Brice 13
Hilands, Bill 13
Knight, Sue 13
Lamb, Glenn 13

Project Total: 66

Project Date: 8/11/2007
District: Columbia River Gorge
Leader: Steve Queen
Location: Gillette Lake south
Description: Cascade Locks PCT Day. Brushed half mile with power brush cutters and hand loppers.

Volunteers

Hours
Berthold, Dana 4
Cobb, Roberta 6
Hammack, Brice 6
Martiny, Chuck 6
Queen, Steve 6

Project Total: 28

Project Date: 8/8/2007
District: N/A
Leader: Steve Queen
Location: Jack Konner's house
Description: August caretaker meeting

Volunteers

Hours
Allen, Eric 3
Berthold, Dana 4
Cobb, Roberta 3
Hammack, Brice 3
Hawley, Bill 3
Konner, Jack 2
Lukins, Dick 3
Owen, Kim 3
Plant, Steve 3
Queen, Steve 3
Vhay, John 3
Webb, Jim 3
Wolf, Becky 3

Project Total: 39

Project Date: 8/1/2007
District: Mount Adams Ranger District
Leader: Tom Linde
Location: Mount Adams Ranger District
Description: 2 miles of brushing and 1/4 mile of tread repair

Volunteers

Hours
Griffin, Scott 8
Linde, Tom 7
McCollum, Bob 8

Project Total: 23

Project Date: 7/29/2007
District: Zig Zag Ranger District
Leader: Kim Owen
Location: Sandy River
Description: Posted signs on ne PCT reroute. Guided in volunteers to worksite. Carried in 40 pounds of food to resupply AmeriCorps crew.

Volunteers

Hours
Owen, Kim 10
Owen, Pam 10

Project Total: 20

Project Date: 7/29/2007
District: Hood River Ranger District
Leader: Barb Adams
Location: Lolo Pass north
Description: Removed 9 trees. Filled 4 holds. Fixed 1 culvert.

Volunteers

Hours
Adams, Barb 8
Adams, Dave 8
Eggleston, Mike 8
Kenny, Harold 9

Project Total: 33

Project Date: 7/27/2007
District: Clackamas River Ranger District
Leader: Ernie Strahm
Location: Jude Lake to Mount Jefferson Wilderness
Description: Removed 17 trees, repaired 12 water bars and 80 drain dips, brushed 2 miles and repaired 4 miles of tread. Repaired 1 slide. Created 5 new log water bars.

Volunteers

Hours
Adams, Myra 17
Brush, Ann 12
Brush, Dan 12
Cuerden, Becky 17
Davidson, Leslie 16
Fisher, Jim 24
Hutchison, Cindy 17
Hutchison, Dewayne 17
Hutchison, Robin 17
Hutchison, Seth 17
Jones, Larry 17
Rivera, Carla 8
Rivera, Richard 8
Robertson, Clyde 17
Roper, David 17
Sheldon, Hal 16
Stoutt, Jeff 17
Strahm, Ernie 25
Welliver, Don 25

Project Total: 316

Project Date: 7/26/2007
District: Zig Zag Ranger District
Leader: Kim Owen
Location: Sandy River
Description: Removed 16 trees (5: 12"; 5: 6"). Surveyed root wad project and Sandy River rebuild. Provided food drop to AmeriCorps crew.

Volunteers

Hours
Owen, Kim 15
Owen, Pam 15

Project Total: 30

Project Date: 7/24/2007
District: Zig Zag Ranger District
Leader: Jack Konner
Location: Sandy River and Muddy Fork
Description: Worked with AmeriCorps crew doing 2 reroutes in Sandy River area.

Volunteers

Hours
Konner, Jack 24

Project Total: 24

Project Date: 7/21/2007
District: Zig Zag Ranger District
Leader: Jack Konner
Location: Top Spur to Muddy Fork
Description: Removed 30 trees (6" to 28"). Cleaned 12 drain dips and 15 water bars. Filled holes in tread.

Volunteers

Hours
Barberis, Joe 13
Bartos, Heather 13
Bartos, Jim 13
Carter, Patty 13
Goodwin, Ron 13
Konner, Jack 13
Lum, Richard 13
O'Neil, Geoff 13

Project Total: 104

Project Date: 7/20/2007
District: Mount Adams Ranger District
Leader: Bob Arkes
Location: Road 23 to Horseshoe Meadow
Description: Removed 15 trees (8" to 10"; 20"). Cleaned 200 drain dips. Brushed from Road 23 to Williams Mine Road. Repaired about 1,000' of tread.

Volunteers

Hours
Arkes, Bob 17
Arkes, Jane 17
Cunningham, John 17
Hawley, Bill 17
Nyberg, Carl 21
Vhay, John 17
Warner, Sam 17
Webb, Jim 15

Project Total: 138

Project Date: 7/18/2007
District: Zig Zag Ranger District
Leader: Kim Owen
Location: Ramona Falls area
Description: Project survey for PCT re-route near Sandy River with Sara Hanson, PCTA Trail Technical Advisior.

Volunteers

Hours
Owen, Kim 12

Project Total: 12

Project Date: 7/16/2007
District: Zig Zag Ranger District
Leader: Ruth Weston
Location: Timberline Lodge to Paradise Park trail junction
Description: Cleaned 15 drain dips. Repaired a 12' slide in Roaring River Canyon. Brushed 800' in Zig Zag Canyon.

Volunteers

Hours
Meador, Corey 11
Weston, Ruth 11

Project Total: 22

Project Date: 7/15/2007
District: Hood River Ranger District
Leader: Barb Adams
Location: Indian Spring
Description: Removed 26 trees (medium to 22").

Volunteers

Hours
Adams, Barb 22
Adams, Dave 22
Eggleston, Connie 10
Eggleston, Mike 10
Kenny, Harold 22

Project Total: 86

Project Date: 7/14/2007
District: Clackamas River Ranger District
Leader: Becky Wolf
Location: Road 4245
Description: Logged out 4 trees (35", 26", 20", 16").

Volunteers

Hours
Reimers, Wes 8
Roe, David 8
Wolf, Becky 8

Project Total: 24

Project Date: 7/11/2007
District: N/A
Leader: Steve Queen
Location: Kim and Pam Owen's house
Description: July caretaker meeting.

Volunteers

Hours
Allen, Eric 3
Arkes, Bob 3
Cobb, Roberta 3
Goodwin, Ron 3
Hammack, Brice 3
Konner, Jack 3
Lukins, Dick 3
McLaughlin, Larry 3
Owen, Kim 2
Owen, Pam 2
Plant, Steve 3
Vhay, John 3
Walker, Richard 3
Weston, Ruth 3

Project Total: 40

Project Date: 7/10/2007
District: Mount Adams Ranger District
Leader: Tom Linde
Location: Panther Crek to Crest Camp
Description: Light brusing for 2 miles

Volunteers

Hours
Linde, Tom 8

Project Total: 8

Project Date: 7/7/2007
District: Zig Zag Ranger District
Leader: Kim Owen
Location: Ramona Falls to Paradise Park Trail Junction
Description: Cleared 60 trees. Brushed 100 yards, pole sawing, repaired washout.

Volunteers

Hours
Cobb, Roberta 22
Coleman, Liz 24
Guzie, Andy 22
Kirchmiller, Christie 22
Kirchmiller, Robert 22
McFeely, Brian 22
Owen, Kim 22
Owen, Pam 22
Panter, Henry 23
Riley, Dave 22
Tausch, Warren 22

Project Total: 245

Project Date: 7/6/2007
District: Mount Adams Ranger District
Leader: Tom Linde
Location: Wind River work center
Description: Tool cache maintenance

Volunteers

Hours
Linde, Tom 4

Project Total: 4

Project Date: 7/6/2007
District: Clackamas River Ranger District
Leader: Becky Wolf
Location: PCT feeder trails near Olallie Lake
Description: Removed 33 logs (6" to 20"). Huckleberry brushing.

Volunteers

Hours
Boeckman, A 13
Boeckman, Renee 13
Carlson, Patty 21
Harrington, Sandy 21
Hunt, Donna 21
Patterson, Bob 21
Stockman, Bonnie 9
Turner, Linda 13
Warren, Jack 21

Project Total: 153

Project Date: 7/6/2007
District: Clackamas River Ranger District
Leader: Becky Wolf
Location: Joe Graham Horse Camp to Jude Lake
Description: Removed 29 trees (16: 12" to 14"; 10: 14" to 29"; 3: >30").

Volunteers

Hours
Levy, Kathy 21
Whitmyer, Dennis 21

Project Total: 42

Project Date: 7/6/2007
District: Clackamas River Ranger District
Leader: Becky Wolf
Location: Joe Graham Horse Camp to Pinhead Butttes
Description: Removed 124 trees (4" to 24"). Cleaned 83 drain dips. Repaired 1 root wad. Light brushing.

Volunteers

Hours
DeVall, Dolores 18
DeVall, Marty 18
Hunt, Bob 19
Hunt, Pat 19
Sischo, Gary 17
Sischo, Peg 17
Wolf, Becky 20

Project Total: 128

Project Date: 6/30/2007
District: Zig Zag Ranger District
Leader: Ruth Weston
Location: Timberline Lodge to Paradise Park Loop
Description: Removed 12 trees (6" to 24"). Cleaned 24 drain dips and 2 water bars. Filled 5 holes.

Volunteers

Hours
Corwin, Susan 9
Schomburg, Dan 18
Traeger, Jennifer 18
Van Gundy, Jackie 18
Weston, Ruth 18

Project Total: 81

Project Date: 6/30/2007
District: Zig Zag Ranger District
Leader: Ron Goodwin
Location: Timberline Lodge to Barlow Pass
Description: Removed 51 trees (14: 4"-7", 22: 8"-13", 12: 14"-20", 3: 21"+). Repaired 15 drain dips and 45 water bars. Brushed 400' huckleberry and vine maple, Repaired 38' of tread. Rebuild 2 cairns and placed 2 4"x4"x4' posts in them.Swept with garden rake 3 miles of trail to remove branches.

Volunteers

Hours
Alway, Tom 10
Gabriel, Michael 10
Goodwin, Katie 9
Goodwin, Ron 9
Hanes, Douglas 10
Irwin, Mark 10
Kellogg, Liz 10
Martiny, Chuck 10
Pronger, Kamra 10
Ranganathan, Nandini 10
Settlemeyer, Lois 10
Walker, Richard 10
Zazilha, Magdalena 10

Project Total: 128

Project Date: 6/29/2007
District: Mount Adams Ranger District
Leader: Tom Linde
Location: Administration
Description: Grant writing

Volunteers

Hours
Linde, Tom 5

Project Total: 5

Project Date: 6/28/2007
District: N/A
Leader: Bill Hawley
Location: Bridge of the Gods
Description: Building tool shed at toll booth for Dana Berthold.

Volunteers

Hours
Hawley, Bill 11
Mikol, Greg 10

Project Total: 21

Project Date: 6/25/2007
District: Mount Adams Ranger District
Leader: Bill Hawley
Location: Road 60 to Junction Lake
Description: Removed 29 trees (2: 20" to 24"; 8: 10" to 20"; 19: <10"). Cleaned 13 drain dips. Repaired 1 root wad. Wilderness sign repaired, but needs replacement.

Volunteers

Hours
Arkes, Bob 13
Brown, Edwin 16
Hawley, Bill 18
Lameka, Ann 10
Mikol, Greg 11
Nyberg, Carl 13
Squires, Bob 10
Weston, Ruth 11
Winkel, Jeannette 16

Project Total: 118

Project Date: 6/23/2007
District: Hood River Ranger District
Leader: Jack Konner
Location: Top Spur to Lolo Pass
Description: Removed over 40 trees (1' to 3'). Cleaned 12 drain dips. Light brushing and spot tread repair over a mile.

Volunteers

Hours
Arkes, Bob 12
Arkes, Jane 12
Carter, Patty 12
Doty, Pat 12
Gabriel, Michael 12
Goodwin, Katie 12
Goodwin, Ron 12
Hammack, Brice 12
Hanes, Douglas 12
Hovin, Leif 12
Kliewer, Dave 12
Konner, Jack 12
Martiny, Chuck 12
O'Neil, Geoff 12
Ranganathan, Nandini 12

Project Total: 180

Project Date: 6/20/2007
District: N/A
Leader: Bill Hawley
Location: Bridge of the Gods
Description: Building tool shed at toll booth for Dana Berthold.

Volunteers

Hours
Hawley, Bill 12

Project Total: 12

Project Date: 6/20/2007
District: Mount Adams Ranger District
Leader: Tom Linde
Location: Panther Creek to Crest Camp
Description: 4 miles of heavy brushing. Repaired 40 drain dips

Volunteers

Hours
Johnson, Gary 10
Johnson, Steve 10
Linde, Tom 10
Zyoloi, Babe 10

Project Total: 40

Project Date: 6/17/2007
District: Mount Adams Ranger District
Leader: Bill Hawley
Location: East Crater Trail 48
Description: Scouting.

Volunteers

Hours
Hawley, Bill 3

Project Total: 3

Project Date: 6/17/2007
District: Clackamas River Ranger District
Leader: David Roe
Location: Clackamas Lake
Description: Removed 125 trees.

Volunteers

Hours
DeVall, Dolores 10
DeVall, Marty 10
Roe, David 11

Project Total: 31

Project Date: 6/16/2007
District: Hood River Ranger District
Leader: Barb Adams
Location: Lolo Pass north
Description: Logged out and cleaned drainage dips for first five miles.

Volunteers

Hours
Adams, Barb 9
Adams, Dave 10
Davidson, Debbi 4
Eggleston, Connie 9
Eggleston, Mike 10
Kenny, Harold 10
Kliewer, Dave 8
Nelson, Brian 8
Nelson, Heather 8
Reed, Marge 6
Tucker, Deniece 10

Project Total: 92

Project Date: 6/14/2007
District: Zig Zag Ranger District
Leader: Ron Goodwin
Location: Timberline Lodge to Barlow Pass
Description: Removed 5 t